Flagship — Yeoju, Korea

Yeoju Resilient AI Energy Campus

A 40MW-class reference project in Yeoju (Seoul metropolitan area) integrating an AI data center with distributed energy — fuel-cell-centered on-site generation designed for resilience with grid interface. The project is in the development stage; all figures are planning baselines.

Site 1 campus aerial — AI-assisted concept render, not an engineering or permitting drawing

AI-assisted concept render — not an engineering or permitting drawing

Development status

WorkstreamPublic statusCategory
SiteProject site rights secured (details confidential)Secured
Community consentLocal resident consent secured (details confidential)Secured
Concept designIntegrated campus & energy concept in progressIn progress
Power & power qualityPursuing technical review with specialist institutionsIn discussion
Generation licensingApplication in preparationIn progress
Supply & EPCKey supply partners partially secured; discussions ongoingPartially secured
FinancingDevelopment-stage structure under reviewUnder review
Anchor customersIdentification and pre-marketingTarget
Target CODAround 2030 (development stage)Target

40MW-class is a public project-scale designation; detailed breakdowns of IT load, facility load and equipment capacity are provided under NDA. Detailed architecture is trade-secret and available in the data room after mutual NDA.

Expansion — Phase 2

Phase 2 Concept — 200MW-class AI Energy Campus

Applying the same integrated land–power–distributed-energy methodology being validated in the 40MW-class reference project, CAYNMARS is planning a Phase 2 campus of 200MW-class scale: multiple 40MW-class AI clusters served by shared energy infrastructure — fuel-cell-centered on-site generation, energy storage, and a reserved district for future hydrogen and carbon management. Phase 2 is at concept stage and does not constitute a confirmed business plan; it will be firmed up based on Phase 1 validation.

Growth path for anchors

Block-by-block expansion under one orchestration — capacity roadmap within a single campus

Power-first development

On-site generation-centered design decoupled from grid connection queues

Toward 24/7 low-carbon

Fuel-cell baseload with storage, plus reserved hydrogen & carbon management district

Early partnership entry

JDA · JV · co-investment structures open to global anchor, technology and capital partners

Phase 2 200MW-class AI energy campus masterplan — AI-generated concept image

Phase 2 campus masterplan concept — AI-generated concept image, not an engineering or permitting drawing; actual layout, scale and configuration may differ

Phase 2 shared energy infrastructure at night — AI-generated concept image

Shared energy infrastructure, night view — AI-generated concept image

Confidentiality — candidate site location and area, power procurement structure, equipment configuration and capacity allocation, and timeline for Phase 2 are non-public and are provided through the data room after mutual NDA.