A 40MW-class reference project in Yeoju (Seoul metropolitan area) integrating an AI data center with distributed energy — fuel-cell-centered on-site generation designed for resilience with grid interface. The project is in the development stage; all figures are planning baselines.

AI-assisted concept render — not an engineering or permitting drawing
| Workstream | Public status | Category |
|---|---|---|
| Site | Project site rights secured (details confidential) | Secured |
| Community consent | Local resident consent secured (details confidential) | Secured |
| Concept design | Integrated campus & energy concept in progress | In progress |
| Power & power quality | Pursuing technical review with specialist institutions | In discussion |
| Generation licensing | Application in preparation | In progress |
| Supply & EPC | Key supply partners partially secured; discussions ongoing | Partially secured |
| Financing | Development-stage structure under review | Under review |
| Anchor customers | Identification and pre-marketing | Target |
| Target COD | Around 2030 (development stage) | Target |
40MW-class is a public project-scale designation; detailed breakdowns of IT load, facility load and equipment capacity are provided under NDA. Detailed architecture is trade-secret and available in the data room after mutual NDA.
Applying the same integrated land–power–distributed-energy methodology being validated in the 40MW-class reference project, CAYNMARS is planning a Phase 2 campus of 200MW-class scale: multiple 40MW-class AI clusters served by shared energy infrastructure — fuel-cell-centered on-site generation, energy storage, and a reserved district for future hydrogen and carbon management. Phase 2 is at concept stage and does not constitute a confirmed business plan; it will be firmed up based on Phase 1 validation.
Block-by-block expansion under one orchestration — capacity roadmap within a single campus
On-site generation-centered design decoupled from grid connection queues
Fuel-cell baseload with storage, plus reserved hydrogen & carbon management district
JDA · JV · co-investment structures open to global anchor, technology and capital partners

Phase 2 campus masterplan concept — AI-generated concept image, not an engineering or permitting drawing; actual layout, scale and configuration may differ

Shared energy infrastructure, night view — AI-generated concept image
Confidentiality — candidate site location and area, power procurement structure, equipment configuration and capacity allocation, and timeline for Phase 2 are non-public and are provided through the data room after mutual NDA.